The $1.25 billion proposal from Texas-based Waterside Energy touted 700 construction jobs and 180 full-time jobs. Waterside’s plan detailed a facility capable of refining 30,000 barrels of oil and 15,000 barrels of biofuel each day. The proposed project also included a propane and butane terminal handling 75,000 barrels per day. The plan also called for three additional trains per week carrying crude oil along the Columbia River.
The combined crude and biofuels refinery was an attempt to capitalize on the West Coast’s demand for cleaner-burning fuels.